Building Progress

Sunday, March 24, 2013

Backfilling

The concrete in for the rear bedroom window was prepared and the window was installed.  All of the galvanized window wells were anchored into the concrete walls.  A complicated process to back fill this property with a bit more machine time than anticipated, hauled back two truck loads of  our fill from the kettle valley site and will need to have a Stone Slinger truck complete the last portion down the side.