Excavation started February 18 with the arrival of the Hitachi 75, we also used a Bobcat Skid steer with a concrete breaker, a mini excavator, floor cutting saw and tamper. A 26 inch wide strip of pavement was removed in front of the house to connect the existing sewer and route conduit for power from the existing panel to the addition. All fill material is stored at the Kettle Valley quarry, concrete and pavement were hauled to Pier Mac for recycling.